Wednesday, June 8, 2011

Pre-Drywall Meeting Went Well

Today was the pre-drywall meeting. Everything went well. The items I mentioned in the previous post have been taken care of as well as some additional items the PM found. I was very pleased with the attention to detail my PM is showing.

The workers we busy laying bricks on the front. (pictures to come later).

I guess there had to be one downfall. I still don't have a closing date. My PM said he should have an exact date no later than Thursday of next week. But we are looking at around the first couple of weeks in August. (The month I'm not allowed to take vacation). I'll find a way!
As for rest of the week and next we should have brick,siding, roof, and dry-wall completed. Also, inspections including Energy Star will be done this week.

I'll post pictures tomorrow, I am too tired tonight.

Pre-Drywall Meeting Today

Today is my pry-drywall meeting. I expect to go pretty smoothly, I had my inspector go out on Monday and he was really pleased with the everything. He only had few things that needed to be fixed. 
1.There was a small tear on the wrapping of the insulation.
2. Third wall stud is bowed between the second floor front bedrooms. Stud needs to be replaced to prevent bow in drywall. 
3. Small hole in the sheathing along left side wall in the second floor
4. Roof decking is covered with felt paper but is torn, so it needs to be re-installed  prior to installing shingles.

Ironically, my PM showed up during the inspection and was marking some the of same issues. So hopefully those have been corrected by out 3:30 meeting.